Overhead arrangement to transmit electrical energy to trains, trams, trolley busses are variously
known as............
India's first section electrified on the 25 kV
AC system was Raj Kharswan–Dongoaposi, Chakradharpur Division, South Eastern Railway, Jharkhand in 1960
Rail:-
known as............
- Overhead catenary system (OCS)
- Over head line (OHE)
- Over head line equipment (OLE/ OHLE)
- Over head wiring (OHW)
- Over head line (OHL)
- Trolley wire
by Kálmán Kandó in Ganz Company,Hungary. |
AC system was Raj Kharswan–Dongoaposi, Chakradharpur Division, South Eastern Railway, Jharkhand in 1960
Rail:-
Cross over:-
Different Systems for Railway Electrification:-
1. DC Traction (1500V /
3000V)
2.
3rd
Rail (750V DC)
3. 1x25kV System
4. 1x25kV System with
BT/RC
5. 2x25kV System (with
Auto transformer)
1x25kV System:-
·
Inductive interference
·
Conductive interference
·
Stray currents
·
Voltage drop issues
1x25kV System
with BT/RC:-
·
Negligible
Inductive interference
·
Less Conductive interference
·
Increases line impedance
·
Interruptions in Catenary
·
System with BT but no RC
2x25kV System
(with Auto transformer):-
·
Addresses voltage drop problems
·
Tap changing auto transformers
·
Has the advantages of the simple and BT/RC
systems
o
No breaks in catenary
o
Reduces interference issues